Builders on site by 7.30am and straight into finishing boxing for concrete and filling groundwork with gravel. They also cut a small doorway between lounge and dining rooms so I could get a wheelbarrow through easily (to prevent damage to new concrete pad while removing concrete from courtyard).
Door between lounge & dining rooms |
Bathroom wall repair work well underway |
Gravel work ready for concrete |